Glossary entry

English term or phrase:

trades (of preliminary design)

Serbian translation:

delatnosti/struke/specijalnosti (u okviru idejnog projekta)

Added to glossary by Bogdan Petrovic
Jun 26, 2018 19:40
5 yrs ago
7 viewers *
English term

trades (of preliminary design)

English to Serbian Tech/Engineering Construction / Civil Engineering
In order to enable the Consultant to finish and to complete the contractual services, most important are:

- To sign the Terms of Reference for all trades of Preliminary Design + Main Design
- To give the formal consent to the Preliminary Design
- Some PUC-conditions are expired - prolongation is the Client's contractual duty
- The Conditions for geo-thermal energy have to be obtained by the Client

Discussion

Natasa Stankovic Jun 28, 2018:
@Daryo Da, u pravu ste. Ovde se pod „trades“ najverovatnije misli na razne struke/specijalnosti u okviru projekta (npr. građevinski, mašinski, elektro itd), a projekti se obično tako i dele. Povlačim stari (pogrešan) predlog i dajem novi u tom smislu. Hvala na kolegijalnom upozorenju i objašnjenju!

Proposed translations

+1
1 day 14 hrs
Selected

delatnosti/struke/specijalnosti (u okviru idejnog projekta)


FIDIC
- 1.1.1.5 „Predlog Izvođača" predstavlja idejni projekt koji je priložen uz Ponudu, kako je predvideno Ugovorom.
- 1.1.1.5 “Contractor’s Proposal” means the preliminary design submitted with the Tender, as included in the Contract.
http://www.aces.rs/aktivnosti/Izdanja/index.sr.html


trade
2. a job requiring manual skills and special training.
"the fundamentals of the construction trade"
sinonimi: craft, occupation, job, day job, career, profession, business, pursuit, living, livelihood, line, line of work, line of business, vocation, calling, walk of life, province, field; work, employment; métier
"he left school to learn the glazier's trade"
https://www.google.com/search?q=meaning trade&ie=utf-8&oe=ut...


S. Šehalić i drugi - Enciklopedijski rečnik građevinarstva i arhitekture:
trade - zanimanje, posao koji obično podrazumeva manuelne veštine; 2. klasifikacija posla pri izradi zgrade na zidanje, stolariju, malterisanje itd.

--------------------------------------------------
Note added at 1 day 15 hrs (2018-06-28 11:15:01 GMT)
--------------------------------------------------

PRAVILNIK O SADRŽINI I NAČINU IZRADE TEHNIČKE DOKUMENTACIJE ZA OBJEKTE VISOKOGRADNJE
2. Idejni projekat
2.1. Idejni arhitektonski projekat
2.2. Idejni projekat konstrukcije
2.3. Idejni projekat električnih instalacija
2.4. Idejni projekat instalacija grejanja, ventilacije, klimatizacije i gasnih instalacija
2.5. Idejni projekat instalacija vodovoda i kanalizacije
2.6. Idejni projekat lifta i eskalatora
http://www.kombeg.org.rs/Slike/UdrGradjevinarstvo/Statika/In...
Peer comment(s):

agree Dragana Zigic
1 day 22 hrs
Hvala!
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Hvala!"
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search